Long School Corridor/Original Oak Parquet Floor Refurbishment
This Gallery is a case study of a recently completed project in North Wales [Mid August 2011] 29 Pictures in this Photo set.
This Long School Corridor at a large school in North Wales was in dire need of a full Refurbishment, the team worked very hard indeed over 4 long days to complete this project, the results really do speak for themselves.....
The parquet blocks as in the other areas we have refurbished in this school were Original Oak, and hadn't had any attention for many years, we also had to attend to minor block repairs in two areas of the Hallway, the area was then properly prepared and readied for the Lacquer system we used on this project.
Which in this case was 1 x Coat of Junckers Baseprime and then three coats of Junckers HP Sport High Traffic lacquer was applied to give a beautiful look and a hardwearing finish to the area.
Back To Main Gallery Page
The main areas we cover are:-
North Wales,Cheshire,Chester,Wirral,Wrexham
and the North West of England.
'We are Professionally Trained and Qualified Tradesmen'
|